As per IS 2502 2(A+B)+24d formula is given for stirrups detailing,but explination not given for how that 24d came
Answer / vimal champaneriya
Lenght of the Two hooks 2 X 12D = 24D
| Is This Answer Correct ? | 14 Yes | 4 No |
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
What is PCO
how cubic feet cement,sand,aggregate required for 1 cubic feet ratio=1,1.5,3
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
how to calculate shuttering measurement of beam and slab
minimum thickness of pcc 1;4;8 for road concrete
What is the mix ratio by volume of concrete grade 45
how many bricks are requir for one unit ho we will caculate
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
What is the outturn of Ceiling plastering
from where ican get sample papers for CET-delhi 2012
How much overlapping required for welding the reinforcement bars in Columns & beams
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)