Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?

Answers were Sorted based on User's Feedback



how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?..

Answer / ranga

take the ratio 1:1.5:3
cement =1
sand =1.5
metal =3
So what is the ratio we want to mixing 1+1.5+3=5.5
Volum of wet cement concret is 1.54 to 1.57
unit weight of cement bag is 1440 kg/cum
one bag of cement = 50/1440 = 0.034722 cum

SOLUTION : CEMENT = 1.54/5.5 =0.28
=0.28/0.0347 = 8.069 ( 8 bags)
one bag of cement =50 kg X 8.069 = 403.45 kgs.

SAND solution =0.28 X 1.5 = 0.42 Cum
1.5 is the mixing proportion
METAL SOLUTION = 0.28 x 3 = 0.84 cUM.
3 is the mixing proportion
1 Cum cement concrete is 1:1.5:3 ratio

cement = 403.45 kgs.
sand = 0.42 Cum.
metal = 0.84 Cum.

Is This Answer Correct ?    679 Yes 142 No

how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?..

Answer / sachdeva d.p

M30- cement=1/4*1.54=0.385*28.8=11bags
sand-0.385*1=0.385cum
agregate 0.385*2=0.77cum

Notes;why we multiply by 1.54
dry dencity=1.54*wet denciti in conct.work

Is This Answer Correct ?    246 Yes 93 No

how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?..

Answer / rajarshi basu

The approach by Sjtbehera is totally correct but has some
little silly mistakes...I have tried to give a rectified
solution.

In the case M30 design mix, the quantities of cement,sand
and aggregates cannot be calculated as it is a variable
quantity.It depends upon the Mix designer how much quantity
of cement,sand and aggregates he will employ.His only
intention would be to design a mix whose specified
characteristic compressive strength at 28 days=30 N/sq.mm
But in case of nominal mix we can use 1:1:2
Let us consider a volume of 10 cu. m (Wet concrete)

It is difficult to access exactly the amount of each
material required to produce 10 cu m of wet concrete when
deposited in place.
Hence to convert the wet volume into dry volume,
Increase by 54 % to account for shrinkage and wastage

Thus it becomes=15.4 cu. m (Variable upto 15.70)

Calculating cement, sand and aggregates in the mix:
Total summation of proportion=1+1+2=4

Cement = 15.4/4= 3.85 cu. m =3.85/0.0347=110 bags
Sand=15.4/4=3.85 cu. m
Aggregates(20mm to 6mm)=15.4 x (2/4)=7.70 cum

Hope u have understood and the mistake is clarified!!!

Is This Answer Correct ?    174 Yes 65 No

how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?..

Answer / ratul

1:1:2

Is This Answer Correct ?    233 Yes 143 No

how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?..

Answer / deepa

how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M7.5 grade concrete ?

Is This Answer Correct ?    34 Yes 10 No

how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?..

Answer / samsulhoque@jadavpur universit

for m30 grade .we have to calculate the quantity of all
ingredients of concrete by design mix as per IS
10262-2009.it depends upon the whether admixture is used or not.

Is This Answer Correct ?    50 Yes 31 No

how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?..

Answer / rahul mehta j.e

Take a Ratio 1:1.5:3
Now 1+1.5+3= 5.5
Now Divide This By 1.52 Which Is wet Volume
Now 1.52/5.5 =0.276
Now Multiply This by 30 Coz 1 Cum Of Cement Contains 30
bags dry.
==> 0.276 X 30 = 8.29 Bags Or 414 Kg cement.

Is This Answer Correct ?    80 Yes 62 No

how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?..

Answer / enayatullah

Take the retio 1:1.5:3
Cement = 1
Sand = 1.5
Aggregates = 3
The volume of none mixed material is 1.52 m3 for one cu.m
mexid concret becouse the the aggregate sand and cement
have porosity that will fill with some of sand and
cement,so 1.52/(1+1.5+3)=1.52/5.5=0.276
Cement=0.276*1=0.276 cu.m = 0.276/0.036*50 bag = 383kg
0.036 is one bag volume
Sand = 0.276*1.5 = 0.414 cu.m
Aggregate = 0.276*3 = 0.828 cu.m
0.276+0.414+0.828=1.518 near to 1.52

Is This Answer Correct ?    45 Yes 27 No

how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?..

Answer / subilash .s(civil engineer)

for designing 1m3 concrete of M25 mix the ratio is 1:1:2
for calculating cement,sand and course aggregate ,
cement= 1/(1+1+2)=.25
density of cement =1440kg/m3
cement required for this mix=1440*.25=360kg=6bags+10kg
sand=1/4=.25m3
course aggregate=1-.5=.5m3
this methode of designing is known as volume batching ,this
methode will be ues to design mixes upto m25.

Is This Answer Correct ?    86 Yes 69 No

how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?..

Answer / fsdfsdfsdfs

For m30 8 bags cement

Is This Answer Correct ?    37 Yes 23 No

Post New Answer

More Civil Engineering Interview Questions

What is the dimension of Slump cone which is used to measure the Slump value of concrete? Slump value for Pile concrete? Slab concrete? Column concrete?

3 Answers  


What is the significance of cost estimate knowledge for an architect?

0 Answers  


An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.

0 Answers  


how to calculate no. of cement bags consumed in 1:4 and 1:6 proportion RR Masonary and the quantity of sand also

3 Answers  


for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area

0 Answers  


What is tha cutting lenght off samosa ring in column 300*600.

2 Answers  


What are the basic use of runners and standards of pipelines?

0 Answers   Bechtel,


Critical Path Method is...

0 Answers  


Can you tell the dia of bars and spacing for a 16'x16' room can you tell the dia of bars and spacing to be used for a slab for a 16'x16' room or any other design you explain

1 Answers  


how much kg of binding wire is used in slab ?

4 Answers   L&T, Standard,


Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

0 Answers   Baseraa,


# 1. Size of slit content in sand. # 2. Gravity of sand # 3. Water observation capacity of sand. # 4. minimum crushing Strength of sand.

1 Answers   Brigade,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)