how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Answer / Chanda Kumari
The consumption of cement and sand for a 4-inch Siporex wall depends on the specific mix ratio used. However, as a general guideline, a typical mix for 4-inch block work might be 1:6 (cement:sand). This means for 100 square feet of wall area, you would approximately need:n- 2.3 cubic feet of cementn- 13.8 cubic feet of sand
| Is This Answer Correct ? | 0 Yes | 0 No |
01m3 cement mortar in cement qty in kg
what type of qustions can i expect from soil mechanics
what is mean by c32/40s concrete class
1 what is the nature of your job? 2 what major product or service does your company offer? 3 hoiw does the knoledge of chemistry hels in your job?
What do you mean by TOLERANCE in steel
how much cement sand n bricks required in im3?and how much in plaster?
how much wall area covered by 1 kg of lapi(putty)
Given a selection of 28 day cube test results for concrete placed of design mix C 35 and not all of which are greater then 35 MPa, how does one decide if the concrete in place is satisfactory. Are there a minimum number of cubes that need to be tested to decide that?
how many spacers we need for 1 ton reinforcement? aprox.
define the strength
area of 8mm rod
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)