Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
10 sq m ,25mm thickness 1:2:4 cement and concrete floor how much cement required? 2 , if truck has a capcacity of 8 ton then how many bricks we can put on it ?
what do you calaculate PCC/GRADE 10
why cracks are being developed in a structure? any specific reason? is there any remedial solution?
what is the concrete grade for 1034.13N/mmsq
what is minimum steel area required for rcc slab
which is greater moment at centre or fixed end moment for a fixed beam with udl
What is the standard volume of pharma in cub ft
0 Answers Deepa Constructions,
What is Critical path in Ms-Project ?
What is the slope of vertical wall ? quick ans
what is the percentage of tolerance in the steel bars
What is the method of soil replacement test?