what is the cutting length of 90 degree bend in four corner
ring in column of 8mm dia size of column 450mmx250mm of
clear cover 20mm?
Answers were Sorted based on User's Feedback
Answer / sandeep kumar
820+220+(2*80)(i:e we take 2 hook 10d each )-5*16(i:e deduction at five corners of the ring , we take 2d each )=1320
| Is This Answer Correct ? | 19 Yes | 2 No |
Answer / devender singh
Cutting length=2*410+2*210+2*80-5*2*8=1320mm
(10d hook & deduction of 2d on each of five bends)
| Is This Answer Correct ? | 12 Yes | 1 No |
Answer / dhaval
A= 450-2*20-2*8 = 394
B= 250-2*20-2*8 = 194
length = 2*(A+B)+4*6*DIA = 2*(394+194) + 4*6*8= 1368mm
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / anurag soni
(410+410)+(210+210)+80=1320mm
1320mm cutting length of 8mm bar
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / abhi
formula 2(A+E)+24d,where A and E are inner to inner
dimension of stirrups i.e A=450-2*20-2*8=384, E=194, so
Lm= 2(384+194)+24*8= 1348mm
| Is This Answer Correct ? | 5 Yes | 5 No |
Answer / ganesan k
410*2+210*2=1240
bend 10*dia,10*8=80*4=240
cutting lenth=1480
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / rajesh singh
820+420+(2*80)(i:e we take 2 hook 10d each )-5*16(i:e
deduction at five corners of the ring , we take 2d each )=1320
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / vinay
(450+450+250+250)-8(20){dedudting covers on all 8 sides}+2*10*8{adding hook length 2*10*d}-5*2*8{deducting on all 5 sides 5*2*d}=1320mm
| Is This Answer Correct ? | 0 Yes | 0 No |
How to find weight of 1cu.m concrete in varies grades? and giive calculation.
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
qube strenth in 7nth days test
what is periode of deshuttering for different area of slab
What is specific gravity & how it is calculated
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
How to calculate the compressive strength of 28 days of concrete where we have 7 days compressive strength?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
Howmuch bend to be provide for 200/600 BEEM
How to calculate the Quantity of Steel for Footing?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)