How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answers were Sorted based on User's Feedback
Answer / rajarshi basu
Keeping the casting of piling in mind on site,it would be
foolish to answer this kind of question as the concrete used
for casting is RMC where we dont get to know the proportions
of mixes the mix designer has used to design the specified
concrete.
Otherwise it is too simple to calculate from Nominal mix design
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / ameen chouhan
The ratio 1:1 is micro piles and 22bags per cum
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / s.r.shiradhonkar
vol of pile is 0.63 cum
Material required
Metal (0.80 cum/cum of concrete)i.e 0.8*0.61=0.488 cum
Sand (0.40 cum/cum of concrete) i.e 0.4*0.61=0.244 cum
cement(0.40 cum/ per cum), (as cement sand ration mentioned
1:1). cement required= 0.4*.0.61=.244 cum. 1bag of 50 kg
have volume 0.035 cum. there for bags required=0.244/.035=
7 bags.
S.R. Shiradhonkar
Amarawati.
| Is This Answer Correct ? | 6 Yes | 7 No |
Answer / dushyant bansal
For 1:1 Cement sand ratio
total volume of either will be same as the ratio will be
1:1
and Sand will cover about 80% volume hence 0.8*0.61=
0.488cum
and same vol of cement.
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
8. Volume of pile -.61m³
If you given cum your ratio is 1:1:2 not 1:1
Total ratio=1+1+2 = 4 so cement = .61/4=.1525m³= 4bags
Sand=.1525cum
Agg.=.1525*2=.305m³
| Is This Answer Correct ? | 5 Yes | 20 No |
Explain major differences between routing maintenance and major maintenance.
What is BDF flooring?
difference b/w stress and strength
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
How much overlapping required for welding the reinforcement bars in Columns & beams
what is column foundation
how to convert sand from Cum to Brass
How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3
How much qty. of cement used for laying 1 Sq.Meter of tiles(600mmx600mm)
what type pressure pipe use in sewerage & water supply?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is the % steel required for a 3x3 slab.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)