How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0..

Answer / rajarshi basu

Keeping the casting of piling in mind on site,it would be
foolish to answer this kind of question as the concrete used
for casting is RMC where we dont get to know the proportions
of mixes the mix designer has used to design the specified
concrete.

Otherwise it is too simple to calculate from Nominal mix design

Is This Answer Correct ?    4 Yes 1 No

How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0..

Answer / ameen chouhan

The ratio 1:1 is micro piles and 22bags per cum

Is This Answer Correct ?    2 Yes 2 No

How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0..

Answer / s.r.shiradhonkar

vol of pile is 0.63 cum
Material required
Metal (0.80 cum/cum of concrete)i.e 0.8*0.61=0.488 cum
Sand (0.40 cum/cum of concrete) i.e 0.4*0.61=0.244 cum
cement(0.40 cum/ per cum), (as cement sand ration mentioned
1:1). cement required= 0.4*.0.61=.244 cum. 1bag of 50 kg
have volume 0.035 cum. there for bags required=0.244/.035=
7 bags.

S.R. Shiradhonkar
Amarawati.

Is This Answer Correct ?    6 Yes 7 No

How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0..

Answer / dushyant bansal

For 1:1 Cement sand ratio
total volume of either will be same as the ratio will be
1:1
and Sand will cover about 80% volume hence 0.8*0.61=
0.488cum
and same vol of cement.

Is This Answer Correct ?    0 Yes 2 No

How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0..

Answer / sjtbehera

8. Volume of pile -.61m³
If you given cum your ratio is 1:1:2 not 1:1
Total ratio=1+1+2 = 4 so cement = .61/4=.1525m³= 4bags
Sand=.1525cum
Agg.=.1525*2=.305m³

Is This Answer Correct ?    5 Yes 20 No

Post New Answer

More Civil Engineering Interview Questions

What is the shelf life of a refractory used in boiler furnace ?

4 Answers   Monster,


what is the difference between ribbed steel & tor Steel ?

1 Answers  


1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.

0 Answers  


what is density of flyash?

5 Answers   ACS,


9. What have you done to improve or develop your knowledge / professional qualifications in the last year?

0 Answers  






why we used bricks in brickbat coba? main roll of bricks ? how it function?

3 Answers   Brigade, Waskom Construction,


quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above

1 Answers  


what is meant by MIS report

7 Answers   HCC, RiceLake,


what happens when the curing is not done properly for structures ??

2 Answers   ANP,


What is grouting? Why it is done?

12 Answers   Gammon,


How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????

0 Answers   CDPL,


The 4 main factors to start a construction project are––

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)