How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answers were Sorted based on User's Feedback
Answer / rajarshi basu
Keeping the casting of piling in mind on site,it would be
foolish to answer this kind of question as the concrete used
for casting is RMC where we dont get to know the proportions
of mixes the mix designer has used to design the specified
concrete.
Otherwise it is too simple to calculate from Nominal mix design
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / ameen chouhan
The ratio 1:1 is micro piles and 22bags per cum
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / s.r.shiradhonkar
vol of pile is 0.63 cum
Material required
Metal (0.80 cum/cum of concrete)i.e 0.8*0.61=0.488 cum
Sand (0.40 cum/cum of concrete) i.e 0.4*0.61=0.244 cum
cement(0.40 cum/ per cum), (as cement sand ration mentioned
1:1). cement required= 0.4*.0.61=.244 cum. 1bag of 50 kg
have volume 0.035 cum. there for bags required=0.244/.035=
7 bags.
S.R. Shiradhonkar
Amarawati.
Is This Answer Correct ? | 6 Yes | 7 No |
Answer / dushyant bansal
For 1:1 Cement sand ratio
total volume of either will be same as the ratio will be
1:1
and Sand will cover about 80% volume hence 0.8*0.61=
0.488cum
and same vol of cement.
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
8. Volume of pile -.61m³
If you given cum your ratio is 1:1:2 not 1:1
Total ratio=1+1+2 = 4 so cement = .61/4=.1525m³= 4bags
Sand=.1525cum
Agg.=.1525*2=.305m³
Is This Answer Correct ? | 5 Yes | 20 No |
What is the shelf life of a refractory used in boiler furnace ?
what is the difference between ribbed steel & tor Steel ?
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
what is density of flyash?
9. What have you done to improve or develop your knowledge / professional qualifications in the last year?
why we used bricks in brickbat coba? main roll of bricks ? how it function?
3 Answers Brigade, Waskom Construction,
quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above
what is meant by MIS report
what happens when the curing is not done properly for structures ??
What is grouting? Why it is done?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
The 4 main factors to start a construction project are––