Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how much binding wire is required for one tone steel

Answers were Sorted based on User's Feedback



how much binding wire is required for one tone steel..

Answer / durai mathan

approximately 10 kg. but due to the size of spacing it"s
varying .

Is This Answer Correct ?    72 Yes 15 No

how much binding wire is required for one tone steel..

Answer / mohammed mohiddin

The question itself is not a relevant one. Binding wire
quantity varies for different kind of structural members
depending upon the design at different region of the world.


We, at UAE 've a thumb rule to estimate for this to
consider as the 2% of total quantity of steel for the
perticular project.And it worked out approximately correct
for the almost of all projects in my carrier.

Is This Answer Correct ?    33 Yes 6 No

how much binding wire is required for one tone steel..

Answer / santosh singh

about 9 to 13 kg per ton as per cpwd specification

Is This Answer Correct ?    26 Yes 8 No

how much binding wire is required for one tone steel..

Answer / asif shaikh

Approximately 10 To 13 Kg As it depents upon the Designof
Steel Reinforcement & Diameter of Bar To be Binded.

Is This Answer Correct ?    21 Yes 10 No

how much binding wire is required for one tone steel..

Answer / muthuraj s

Approximately 7kg/MT in my site Gammon India Ltd.... We
have already calcuted and checked..

Is This Answer Correct ?    17 Yes 6 No

how much binding wire is required for one tone steel..

Answer / prashanth

6 to 7.5 kgs/tonne

Is This Answer Correct ?    15 Yes 6 No

how much binding wire is required for one tone steel..

Answer / ashish chordiya

The binding wire quantity depends design n use of wire actual site

Is This Answer Correct ?    6 Yes 0 No

how much binding wire is required for one tone steel..

Answer / kapil jain

approximate 7 to 10 kg per ton binding wire required. it is depend upon the Design of
Steel Reinforcement & Diameter of Bar To be Binding.

Is This Answer Correct ?    4 Yes 1 No

how much binding wire is required for one tone steel..

Answer / chandan singh bhaisora

9 - 10 kg or 2% of total consumed steel

Is This Answer Correct ?    5 Yes 3 No

how much binding wire is required for one tone steel..

Answer / sanjay kumar pati

6 to 8 kg per ton ,but as per dia &speceing

Is This Answer Correct ?    3 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

what would be the rqmnt. of cement and sand (1:6)for building brick wall and also 20mm thick plaster on the wall by same ratio?

1 Answers  


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

0 Answers  


What are the precautions needs during concrete pouring in very hot weather?

1 Answers  


How will be cutting in timber plate size 600*400 column size

0 Answers  


how much binding wire is reqd for 1 MT

8 Answers   IVRCL,


How much pressure will be drop when we apply the P.R.V. In the upvc downtake for stilt 28?

1 Answers  


What are the causes of building collapse?

0 Answers  


definition of compressive strength. definition of compressive stress.

1 Answers  


how much quantity of binding wire required for tieing of 1mt of reinforcement bar?

5 Answers  


what is the difference between np2 and np3 concrete mix

0 Answers   Sri Matha Constructions,


what is the quantity out-put by Hitachi-200 breaker for breaking or how to calculate

0 Answers  


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)