how much binding wire is required for one tone steel
Answers were Sorted based on User's Feedback
Answer / durai mathan
approximately 10 kg. but due to the size of spacing it"s
varying .
Is This Answer Correct ? | 72 Yes | 15 No |
Answer / mohammed mohiddin
The question itself is not a relevant one. Binding wire
quantity varies for different kind of structural members
depending upon the design at different region of the world.
We, at UAE 've a thumb rule to estimate for this to
consider as the 2% of total quantity of steel for the
perticular project.And it worked out approximately correct
for the almost of all projects in my carrier.
Is This Answer Correct ? | 33 Yes | 6 No |
Answer / santosh singh
about 9 to 13 kg per ton as per cpwd specification
Is This Answer Correct ? | 26 Yes | 8 No |
Answer / asif shaikh
Approximately 10 To 13 Kg As it depents upon the Designof
Steel Reinforcement & Diameter of Bar To be Binded.
Is This Answer Correct ? | 21 Yes | 10 No |
Answer / muthuraj s
Approximately 7kg/MT in my site Gammon India Ltd.... We
have already calcuted and checked..
Is This Answer Correct ? | 17 Yes | 6 No |
Answer / ashish chordiya
The binding wire quantity depends design n use of wire actual site
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / kapil jain
approximate 7 to 10 kg per ton binding wire required. it is depend upon the Design of
Steel Reinforcement & Diameter of Bar To be Binding.
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / chandan singh bhaisora
9 - 10 kg or 2% of total consumed steel
Is This Answer Correct ? | 5 Yes | 3 No |
Answer / sanjay kumar pati
6 to 8 kg per ton ,but as per dia &speceing
Is This Answer Correct ? | 3 Yes | 1 No |
Explain why concrete barriers have curved surface profiles?
what is step foundation
what is pqc
how many types of foundation
Manpower required for de shuttering of conccrete slab
types of piles detail,
0 Answers DLF, IVRCL, JP Group,
1:6 brick masonry cement and sand calculations
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
what do you calaculate PCC/GRADE 10
How to calculate the Volume of PCC, Footing Base, Footing Column, Grouting, Base Plat and plinth beam
1.how to calculate the nails qty in shuttering of column,beam, shear wall. 2.how control the binding wire wastage in building project. 3.
in m25 concrete what is m.