What is horizon or horizontal mining?
No Answer is Posted For this Question
Be the First to Post Answer
what is two point problem.
in 1:2:4 concrete, spcify 1,2 and4 as towhat they indicate?
what is unit of density,specific gravity
to minimize budget cost of building , what can i do
how to clculate the %of concrete strenght achive after curing?load
0 Answers L&T, RJ Construction,
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
what course did you consider thinking before you enrolled in college?
what is the diffreance between 1 way slab& 2way slab?
Can anybody please tell the procedure to calculate the quantity of admixture in Self Compacted COncrete??
How to repair the Pavement quality conc used for toll plazas if is giving hungry look or honeycombed ? how much cement need to treat 100sqmtr of Damaged PQC
What is the 162 in steel weight formula?
what is the types of door's wood?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)