Answer / pradeep k sharma
AS PER IS CODE, IT IS 3% ,BUT CONSIDERING THE COMPULSION TO
USE THE AVAILABLE RIVER SAND IN THE NEAR BY, THIS LIMIT CAN
BE INCREASED UP TO 5% ,IF ADVERSE EFFECT IS NOT OBSERVED ON
THE STRENGTH OF CONCRET CUBES TESTED BY CONDUCTING TRIAL
MIX TEST IN LABORATORY,IT IS UP TO THE DESCRETION OF
ENGINEER IN-CHARGE TO AMEND THE LIMITS GIVING DUE WEIGHTAGE
TO ALL THE FACTORS AS MENTIONED.
Is This Answer Correct ? | 5 Yes | 0 No |
Geometric Design Related Code name in India.
What are segregation and bleeding?
y we need to take 28 days strength as compressive strength ? y cant we take 30 th day
which lime used in white washing
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what is difference between footing and foundation?
How to defind P.C.C. mix design according ratio & IS coad
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
which is cover of r.c.c. column,beam and slab
how to calculate the quantity of plaster.
as per is code, what is the minimum content of opc and ppc cement for rcc structure
What is meaning of M25 grade