How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answer Posted / sjtbehera
8. Volume of pile -.61m³
If you given cum your ratio is 1:1:2 not 1:1
Total ratio=1+1+2 = 4 so cement = .61/4=.1525m³= 4bags
Sand=.1525cum
Agg.=.1525*2=.305m³
| Is This Answer Correct ? | 5 Yes | 20 No |
Post New Answer View All Answers
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
I need model question papers for writing the Dubai municipality exam,for G+1
which type of instrument included in plumbing work?name of instrument?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
In earth work 1300 cum soil how to calculate how many liters require in water
Mention different types of roof systems?
Sir how to find cutting length for footing steel bars in the shape of "u"
what is smart building materials?
how much cement and sand required for 100sqm of wall plastering in different proportions
types of piles detail,
How much cement,sand,bricks and water needed for 1square metre brick work?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
dialation means