How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answer Posted / ameen chouhan
The ratio 1:1 is micro piles and 22bags per cum
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
In case if concrete box girder bridges how is the number of cells determined?
Formula of area of crane hook
what is shuttering co efficient?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
What are the applications of modulus of elasticity?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
what values & beliefs have guided you in your career path
Trapezoidal section footing calculation of Volume & its Area
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
How to find permissible diagonal tensile stress in reinforced brick work
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
What are the advantages of cad software?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
how meny typs of renging rod?