Answer Posted / dushyant bansal
For 1:1 Cement sand ratio
total volume of either will be same as the ratio will be
1:1
and Sand will cover about 80% volume hence 0.8*0.61=
0.488cum
and same vol of cement.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Floor tile measurement? Wall to wall or skirting to skirting
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
What is the use of offset command?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
detailed calculation of the amount of cement used?
How can explode a block?
Which tests are performed on soil to decide the type of foundation to be provided.
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
Why concrete barriers have curved surface profiles?
How do you calculate load bearing capacity of a waffle slab?
How is the strength of cement measured?
how to tie 10 legged stirrups
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
List out the types of roofs?
How and where are aqueducts built?