How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answer Posted / dushyant bansal
For 1:1 Cement sand ratio
total volume of either will be same as the ratio will be
1:1
and Sand will cover about 80% volume hence 0.8*0.61=
0.488cum
and same vol of cement.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
how we can find sieve #4 is 4.75mm?
What is difference between engineering stress and true stress?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
What is absolute pressure? How absolute pressure is calculated?
During reclamation how can the occurrence of mud waves can be rectified?
how to create our resume?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
how to tie 10 legged stirrups
Mention different types of roof systems?
what is the water-cement ratio of mix design while 30mpa in 7 days?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.