What is the difference between ATP check and availibilty
check how these reflect in sales order(which check system
considers) what are the IMG settings for the same




Answers were Sorted based on User's Feedback



Answer / sundar raghuraman

Availability check determines if the desired qty. can be
met on the desired dly.date.
There are 3 types of Availability checks 1. Against ATP 2.
against product allocation 3. against planning.(push cycle)

Availability check is based on checking group(defines the
type of requirement) and Checking rule (scope of
availability i.e.,how the check has to be done)

And this can be configured in IMG -SD- Availability Check
and Transfer of requirement.

Product allocation: In demand times we can limit the dly.
qty to the customers and that time the check will be done
against product allocation.

I welcome any other detailed answers

Is This Answer Correct ?    16 Yes 3 No

Answer / seetharam g.k.

Q What is the difference between ATP check and availability
check how these reflect in sales order (which check system
considers) what are the IMG settings for the same

? ATP is know as available to promise quantities and it is
calculated as below.

Ware house stock + planned receipts ? Planned issues = ATP
quantities.

Ex1. 100 + 50 -75 = 75 is ATP Quantity

Any remaining open quantity in the movement is regarded as
the ATP quantity and can be used to fulfill the next
requirement.
Ex2. 25 + 100 -150 = -25 ATP Quantity,
In this case the system try to capture the stock from other
inward movement and try and match the order quantity 150.and
even this is not available and partially met then the system
shows the negative ATP Quantities in the requirement line.
? During the availability check the system determines the
ATP quantities for the material and the pant.
? The system behaves in performing the availability check
based on how the availability check is set in customizing.
? This can be viewed in the sales order ? over view screen ?
procurement and you can see the confirmed quantity and ATP
Quantity.


Availability check:

Stock checks which is automatically carried out after every
goods movement and which should prevent the book inventory
balance of physical stock (for example, available stock)
from reaching zero.
types of Availability checks
1. Against ATP
2. against product allocation
3. Against planning.
Availability check is based on checking group, Requirement
class, and Requirement type and schedule line category.

Is This Answer Correct ?    8 Yes 2 No

Answer / subha

One is process and the other is actual check which you do
before you take the actula delivery detrmination or order
process

Is This Answer Correct ?    1 Yes 0 No



Post New Answer



More SAP SD Interview Questions

Suppose we have maintained 2 output types for delivery, for both we have records. both r displayed in delivery. But clients requirement is to suppress any one of the output type. where is the control?

2 Answers   Cap Gemini,


Where I can Get best SD Training in Mumabi from realtime? please answer me asap

1 Answers  


What are the different billing process u have done in your project.

3 Answers   iGate,


How can you assign different delivery dates to an item in the sales order?

2 Answers  


in sales order where u can find warehouse no

2 Answers   Infosys,






Would you have different customer numbers if your customer was serviced by more than one company code? Would you have different customer numbers if your customer was serviced by more than one sales organization?

2 Answers  


Can we change the ship to party a sales order?

2 Answers  


Hi friends I am Ramesh. I have a doubt. From Which stage we gathered data(as is study) from client. In project preparation stage or from Business blue print stage

3 Answers  


I want to give discount on a particular item, if a specific item is purchased. i.e., for ex: if a TV set was purchased, and a DVD player also purchased by the customer, i want to give disount on the DVD player. How to set the price condition for this scenario.

7 Answers  


what is requirement in pricing proc determination plz tell in depth with examples i faced this prob in an interviw thanls sneha

8 Answers   IBM,


What is Material type control?

6 Answers  


can we make many ship to party under one sold to party fucntion

3 Answers  






Categories