Can anyone explain how the vector diagram of a transformer
which doesn't have name plate be found whether it is
Dy11/Dy5/Yd11 and so on?
Answers were Sorted based on User's Feedback
Answer / geno peter
well , we can find the vector group by doing vector group
test
| Is This Answer Correct ? | 13 Yes | 1 No |
Answer / loke
Ya ! first of all you can decide Yd or Dy by seeing it
primary & secondary connections and 1,2,3....11 we can
decide it by doing vector group tests int that we can check
phase shift of wave form & we can conclude
| Is This Answer Correct ? | 7 Yes | 0 No |
Whether Dy or Yd can be ascertained from the bushings.To
find particular vector group ,CRO can be used finding
relationship between the current vectors.e.g.In Dy 11 I2R
lags I1R by 30 degrees Number 11 denotes position of minute-
hand in a clock.It can also found out by taking various
voltage measuremnts and analysing
| Is This Answer Correct ? | 7 Yes | 0 No |
Yah! can.
If Dy11
Primary winding having only 3 terminals with high
resistance and secondary havign 4 terminals with low
resistance.
If Yd11
Primary having 4 terminals with high resistance and
secondary having 3 terminals with low resistance.
If Dy5
This is not a verctor group.
Eppdi???
| Is This Answer Correct ? | 8 Yes | 30 No |
What is mean by ideal infinite bus? Why it is required to consider in fault short circuit calculations?
I am having dual speed motor of cromton greaves make of 3.7 KW -1400 rpm and 5 KW - 900 rpm. Please let me know groups and winding connction for rewinding purpose.
why dont we connect the two 12 V DC batteries in parallel, for an inverter (UPS)? is there any harm ?
what is cut out fuse?
What current can be carried by 25 sqmm copper cable safely?
if 400kv line is connected to the load but neutral ii not be connceted then wt ll happen
Explain the operation of damper winding
A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE TO FINISH THE WORK IS 1.11 2.21 3.28 4.42
what is the differences between single phase ind. motor and three phase ind.motor?
whats the differece between Exd and Exe
when we design electrical schemes of 11/.415kv distribution..wen and were should we show the relays??what is the function of it?for example..we place EFR Relay CT between transformer neutral link and transformer earth.Like this what are the other type of relays we should use?why?where?Explain please..Thank you
What is the Difference Between the SCADA & PLC ? Both it also control and Supervise Then what Special in Scada & PLC?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)