Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to take Vector group test of Transformer?

Answers were Sorted based on User's Feedback



How to take Vector group test of Transformer?..

Answer / ambrish

Pl. show the standard formula to check vector group tst for
any type of transformer.

Is This Answer Correct ?    3 Yes 0 No

How to take Vector group test of Transformer?..

Answer / raj

the above answer is correct but suppose a newly transformer
has come on the site ?
and nothing is written on the transformer how v will do the
vwctor test for that any one will explain that

Is This Answer Correct ?    3 Yes 3 No

How to take Vector group test of Transformer?..

Answer / tansford

Superimpose the HV & LV vectors with 1U & 2U as common it
clearly shows the relation between the phasors
Every vector group will have a different relation &
equation to be evaluated

Is This Answer Correct ?    0 Yes 0 No

How to take Vector group test of Transformer?..

Answer / raj_singh_0376

Procedure of vector group test of transformer


Let’s have a YNd11 transformer.

1) Connect neutral point of star connected winding with earth.

2) Join 1U of HV and 2W of LV together.

3) Apply 415V, three phase supply to HV terminals.

4) Measure voltages between terminals 2U – 1N, 2V – 1N, 2W – 1N, that means voltages between each LV terminal and HV neutral.

5) Also measure voltages between terminals 2V – 1V, 2W – 1W and 2V – 1W.

For YNd11 transformer, we will find,
2U – 1N > 2V – 1N > 2W – 1N
2V – 1W > 2V – 1V or 2W – 1W

Is This Answer Correct ?    1 Yes 1 No

How to take Vector group test of Transformer?..

Answer / ponnudura

can anyone say me hoe to draw vector group and what is the
use of different vector group and its application plz

Is This Answer Correct ? 17 Yes 8 No submit
srinivas

Answer
# 8 1.1U1V1W-which is primary -Delta Connection
2.2U2V2W- Which is secondary-Star connection
3.join 1U& 2U terminals
4.Supply 1U-1V-1W 440v Measured
a.1U-1V
b.1V-1w
c.1W-1U
d.1W-2W
e.1V-2W
f.1V-2V
g.1W-2V
h.1U-2N
i.1V-2N
TO CHECK
1.1V-2W=1V-2V
2.1W-2V>1W-2W
3.1U-1V=1V-2N+1U-2N
From above check(1,2) the vector group of transformer is
verified

Is This Answer Correct ?    0 Yes 0 No

How to take Vector group test of Transformer?..

Answer / balaji

1) Can i know why we are making short of any phase during vector group test ?
for Example R-r,Y-y Like that
2) while doing the vector group why the neutral earth should be removed ?

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

how much rating of fuse and MCB should be used for a load consisting of 6KW and 18KW inductive load?

1 Answers  


why the neutral point in connnection oscillates?

0 Answers   Avalon,


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

0 Answers  


what is back emf?

4 Answers   Bhel,


What the methode get earth resistance?

2 Answers  


why the transformer ratings in kva

8 Answers   NTPC,


what are the disadvantages of low power factor

0 Answers   HMK,


What is the Relation b/w star delta starter , DOL starter and two speed starter. if we want to rotate a 20 kw fan in 2 speeds which type of two speed starter we have 2 use?

1 Answers   ABB,


which course is maximum demand in industry and give me the list of best courses for electrical engineers

1 Answers  


what is the IEC standard for Power Cable installation in onshore (like in direct buried ground or above groung)

0 Answers   L&T,


i am confused about generator. i have generator of 380 KVA that is 304 KW by that formula KW=KVA*0.8... then by this formula I=KW/V*1.732*0.8 the amperes are 528.673. so that is the load which i put on one phase of generator or this is total 3 phase load on Generator.......

3 Answers   Haliburton,


HOW TO CALCULATE UPS BATTERY BACKUP TIME

3 Answers   HSBC, VRVS,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)