How can we design MEP services for Commercial Building in
area about 22 Acres of land?
Answer / shiva
MEP design will be majorly three parts.
Electrical:
Load to be calculated after approval of the client. then the cables, panels, lights to fixed.
Plumbing
There are two types here. 1. Water supply system and 2 Drainage system.
ACs - if any
Fire protection system.
| Is This Answer Correct ? | 11 Yes | 0 No |
what are the effects on an power plant and consumers if the power factor is increased or decreased?
Explain the advantages and disadvantages of thermal power plant?
How can we calculate earth mat conductor size ..? & give the formula to determine earth conductor size?
what is LOS(line of sight)?
how to calculate transformer load?
what is the difference b/w pvc cu conductor and cu breaded wire..?
presently I am working in private sector.In powergrid interview recruiter asked me why you join this organization.
How to calculate energy stored in a capacitance
How to run 1ph motor(230 VOLTS its full load amps is 4.5 ampa))with 480 volts main(we didn hav neutral)Thn we go for step down transformer.Our load 10 amps,so we conisder this amps in primary are secondary side
WHAT R THE SAFETIES IN A HIGH TENSION PANEL N LOW TENSION PANEL. ALSO WAT SAFETIES R THERE IN A 200 KVA TRANSFORMER?
what's the difference between 'shaft power demand' and 'BHP' , when we consider electrical load list.
why there is 1 phase and 3 phase but not 2 phase and 4 phase?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)