How to take Vector group test of Transformer?
Answer Posted / raj_singh_0376
Procedure of vector group test of transformer
Let’s have a YNd11 transformer.
1) Connect neutral point of star connected winding with earth.
2) Join 1U of HV and 2W of LV together.
3) Apply 415V, three phase supply to HV terminals.
4) Measure voltages between terminals 2U – 1N, 2V – 1N, 2W – 1N, that means voltages between each LV terminal and HV neutral.
5) Also measure voltages between terminals 2V – 1V, 2W – 1W and 2V – 1W.
For YNd11 transformer, we will find,
2U – 1N > 2V – 1N > 2W – 1N
2V – 1W > 2V – 1V or 2W – 1W
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
placement paper samples of mspl company
difference between power surge and switching transient
how a resistor resists to flow the current?how an inductor oppses the sudden change in current?how a capacitor opposes a DC voltage.
How to confirm the Phase shifting Transformer VECTOR GROUP relation , as below ZNy11.45d10.45-ZNYy0.15d11.15
can I improve the furnace power factor (10 mva transformer) by adding a capacitor bank before the transformer.Does system power factor vary a lot with the furnace PF?
I just purchased a 4 position cam switch to be used to operate a 3-speed blower motor. The motor is a 10 amp motor and has 3 wires that are used to control speed. The cam switch was rated at 660V 20 amps but when I received it, I noticed that it has AC-15 operational current rating (Ie) of 4/5 amps. If I am reading the label correctly. the 4/5 amps is related to 440v/220V (Ue). Other ratings are AC-3: 5.5A, AC2: 7.5A and AC-4: 1.5A. My questions are 1) Is it safe to use this switch with the motor I have 2) what is the difference between the 20 amp Ith ratting and the Ie operational ratings?
what is earth pit , how we can measured it, what earth rods reference
What is creepage distance..... what will be the value for different voltage level
I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.
In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?
What is s-domain and its significance?
how to interlock 3 nos MCCBs using under voltage coil. please provide me circuit diagram?
what are the preventive maintanance actions taken for air circuit breaker? please answer me
What is resistance of 50meters, 16sq.mm, single core copper cable?
EXPLAIN THE TRANSFORMER MAINTENANCE?