How breakdown maintenance and corrective maintenance are different from each other?
No Answer is Posted For this Question
Be the First to Post Answer
What is the task list in preventive maintenance?
What level of functional locations should be changed for alternative labelling?
What is the use of PM02 control key??
What do you understand by functional structuring of technical objects?
How can you get the maintenance cost separately for labor, external services and material in a maintenance order?
How pm module is integrated with ps module?
Is it possible to determine header tasks automatically at save without selecting the save + determine tasks button?
What is the use of cats?
Which maintenance plan is suitable for managing outline service agreement and what call objects are required?
How equipment master is integrated with asset master in fi module?
What is the integration between pm and qm in sap?
Can a service order be generated automatically without running ip30 if we have scheduled a maintenance plan?