If I want to change the planning plant for the task list, how should I proceed?
No Answer is Posted For this Question
Be the First to Post Answer
Why cost center field is important in equipment master?
What are the different reports under plant maintenance in information system?
What are class and characteristics? What are their use?
How to configure system to allow notification type change?
You want to make zip code field mandatory in a maintenance order. How would you do that? List the steps you will take.
You want to block service to a customer. How would you do that?
Where to get the table which is having user status with notification number. (Not the system status)?
How would you attach a drawing to the equipment master data?
what is the use of item number in maintenance order ?
Is it a rule that you will use pm04 order type for refurbishment? Can you configure another order type for refurbishment?
Which configuration setting allow a calibration order to trigger an inspection lot from maintenance order?
How does actual cost of maintenance come on maintenance order?