What is a 'product hierarchy'?
No Answer is Posted For this Question
Be the First to Post Answer
What is the purpose of using capacity planning?
Integration between PP and MM Module.
What is default values at work center
Describe control key utility & also standard key ? how many fields can be configured for standard value key?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
what is the difference between backward scheduling and forward scheduling ?
• What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?
Difference between plan cost, Actual cost and target cost.
Checkdigit example
What is the difference between stock transport order and stock transfer order?
What is recursive BOM
What are basic dates?