Explain what is “work center” in sap pp and what is the use of data in work centers?
No Answer is Posted For this Question
Be the First to Post Answer
what is pegged requirements
Can you dispatch capacity for a single work center
What are the lot size you have used?
when we need to close the production order, before the manufacturing or after the manufacturing
What is Schedule Margin key. How floats works in scheduling?
How to insert an inspection checkpoint at the end of an operation?
Standard mrp steps
what is the significance of process order over production order
5 Answers Cap Gemini, IBM, PCS,
Which tool you are using
You want to integrate pp with fico. What steps would you take?
Where have we to specify the teardown time in one operation?
Difference between PP and PI.