I would like to get the formula
How can i calculate the productivity of a mason in terms of brick laying and plaster.
i have 6000 Sqmt of interlock laying work
i want to calculate
- how many masons required to do the job
- in how many days can it be done
- what will be the production rate in 8 hours shift/ per mason
if i can get some excell sheet , it will really help me in my calculations
No Answer is Posted For this Question
Be the First to Post Answer
What is meant by hydration of cement??
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
Explain what is alternate bid?
what or who influenced you in making your choice?
Is the ratio fixed for M-20,M-25,M-30,M-35....grades of concrete??
2 Answers Ahluwalia Contracts, L&T,
Weather we heat cement, will it changes its color? if yes why? if no why?
pile load testing procedure
how can i calculate cement in brickwork
what is lap length? why it is required?
what is the max spacing of 2 columns upto which there is no need to put beam betwn dem.and how to fix the location of columns and beams in home construction.
density of crush sand & crush stone or grit powder
what if tie beams coming from x axis do not meet tie beam coming from y axis? Is it safe if they dont meet?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)