I would like to get the formula
How can i calculate the productivity of a mason in terms of brick laying and plaster.
i have 6000 Sqmt of interlock laying work
i want to calculate
- how many masons required to do the job
- in how many days can it be done
- what will be the production rate in 8 hours shift/ per mason
if i can get some excell sheet , it will really help me in my calculations
No Answer is Posted For this Question
Be the First to Post Answer
Please any body describe me manpower used calculation for a building construction.
1 Answers Metro Constructions,
9*9m 1:4:8 ratio using what quantity of 40mm aggregate, sand&cement please tell anwser
Explain the difference between slab and beam?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
explain how to calculate top and bottom diagonals for transimission line tower foundation with prop setting
Why did you choose this career?
what is the permanent solution applied for restoration of leaning tower of pisa?
Give me an example of a time when something you tried to accomplish and failed.
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
Need advice for steel in kg for RCC Slab qty 35.64m3 and Beam/ column qty 35.39m3
beam is fixed at both end which is 8 m span carry udl of 10 kn/m at left half span.there is internal hinge at center.what is reaction at center
How do you measure concrete?