how will calculate the lift load in high rise buildings
No Answer is Posted For this Question
Be the First to Post Answer
what is education Cess.
How much steel required for 1000 sq ft slab 4" thickness.
How much is the curing time period?
How much cement ,steel bar, concrete ,required for 416 cum rcc slab
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula
What is the finess modulus of sand?
how many bricks are consumed for 01 Cum of brick work
what is penetration test?why it is done?
why we use min. 12mm dia bar in a coloum.
7 Answers BPCL Bharat Petroleum,
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
why loss of strength in concrete in 7 days cube test i am not geting mim 7 days strength that is 67 percent for M-35 and my mix design is perfect there is no doughty,and my results are near to 7days percentage but not 67 percent.
4 Answers UPPSC Uttar Pradesh Public Service Commission,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)