how to replace 8mm bar with 10mm bar if the the 8mm bar is not available..???
Answers were Sorted based on User's Feedback
Answer / mustafa mohammed layeak
Area of 8mm dia bar = 50.28 sqmm .
Area of 10mm dia bar= 78.57 sqmm .
For example if you don't have 8mm dia bar available to use
in 1m strip of slab,then one can use 10mm dia bar with an
increased spacing relative to 8mm dia bar.And reqired area
of steel in 1m wide strip is 452 sqmm/m length (Ast/m
length). the calculation is as follows
Using 8mm dia bar we get spacing in 1m wide strip as
s=[(b*Abar)/Ast] therefore s=[(1000*50.28)/452]. Therefore
required spacing with 8mm dia bars= 111 mm c/c.
similarly the required spacing using 10mm dia bars will be
spacing = [(1000*78.57)/452]. Therefore required spacing
using 10mm dia bars = 173mm c/c in 1m wide strip length.
| Is This Answer Correct ? | 63 Yes | 9 No |
Answer / murali
dia^2/spacing=dia^2/X
if there is 10mm rod 150 mm spacing replace 8mm
100/150=64/X
0.6666=64/X
therefore X=64/0.666
=96mm
if you provide 8mm rod spacing should 96mm
| Is This Answer Correct ? | 27 Yes | 4 No |
Answer / subhasis1991
You can think this in other way...
To use 10mm dia bars you just need to calculate spacing to be provided.....
When you are to use 8mm bar you would be provided the spacing(S1)..Now the spacing to be provided for a design is dependent on bar area(which is proportional to bar dia^2)...For greater bar area spacing would be less and vice versa ,so spacing is pretty much inversely proportional to the area of bar...Now to get 10mm bar spacing you just need to calculate :S1*(10^2/8^2) and you are done..
| Is This Answer Correct ? | 20 Yes | 10 No |
what is IS
12 Answers GMR, JMC, JMC Projects,
how many bag of cement needed for concreting 14.93 m3 at the ratio of 1:4:6 and 1:5:6
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
what are the advantages and disadvantages of using bentonite slurry in bored cast in situ piles, both in terms of design and execution point of view.
List out some of the checking’s, done at the completion of construction?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
wat happens to the foundation when only live & dead loads are considered( wind load is excluded) during the design of tall structures. options are: a)only settlement in the internal structure and not external structure b)only settlement in the external structure and not internal structure c)no differential settlement d)none of the above
4 Answers BBJ Construction, IOCL,
External staircase area outside the independant house includes in plinth area or not?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What is the purpsoe of FTA and MTA plumbing??? Is there any books which can provide details of lumbing fittings and its requirement??
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)