how much cement is required for 100 sft plastering of ratio
1:4
Answers were Sorted based on User's Feedback
Answer / ahmed j (if u any question to
Thikness Of Plaster 18 To 20mm
Sand in 1Cubic mtr =1.25 For All Ratio
Cement in 1 Cubic mtr For
1.3 = .21
1.4 = .31
1. Thikness Of Plaster For 1st Coat is Roush Coat 12mm
*Propotion of C:M For 1st Coat With Ratio 1:6 , 1:5,
2. Thikness Of Plaster For 2nd Coat is Fine Coat 6 to 8mm
*Propotion Of C:M For 2nd Coat With Ratio 1:4 , 1:3
Area Is 100sft / 3.28^2 =
9.295 * 0.008=
Area * Thikness
0743*.31=
Volume * Ratio
0.023*1440=
Quantity * Cement Volume
Cement Quantity Required Is 33.20 Kgs (With Out Wastage)
| Is This Answer Correct ? | 35 Yes | 15 No |
Answer / qudrat
what is the cost of cement for plaster 2'' for the ratio of 1 to 4
| Is This Answer Correct ? | 7 Yes | 3 No |
Answer / shailesh srivastava
6mm thk far 1 sqm
Qty executed=1x1x.006
20% extra for voids & wastage=.0012
total =.0072
30% extra for dry =.00216
Total required qty =.00936 cum
Cement =.00936/5
=.001872 cum
far 1 sqft =.001872/10.76
far 100 sqft =100*.001872/10.76cum
=100*1440*.001872/10.76
=25.052 kg
| Is This Answer Correct ? | 9 Yes | 19 No |
Answer / ndd
In this question plastering thikness is not mentioned.
Consider,plastering ( Cement and sand)thickness = 10mm
100 Sqft = 9.29 Sqm
-------------------------------------------------------
Wet Mortar volume= 9.29 X 0.01Cum =0.0929 Cum
Dry Mortar volume = 0.0929 X 1.15 =0.106835 Cum
Cement = 1/4 X 0.106835 X 1400 Kg =37.392 Kgs
(Volume of cement is ignored )
Hence for 100 Sqft area,and 10mm thick plastering the
cement quantity required = 37.40 Kgs ( Without wastage)
| Is This Answer Correct ? | 7 Yes | 20 No |
Answer / karthikeyan.n
1 sq.m = 10.76 sq.ft.
100 sq.ft = 9.29 sq.m
cement required for 10 sq.m = 3/(1+4)=.6*1440/50 = 17.28bag,
100sq.ft cement required = 1.728*9.29 = 16.05 bags
| Is This Answer Correct ? | 34 Yes | 93 No |
What is differnce between founadation & footin ?
What is oneside mat. And explain
how to check the quality of concrete
whch is the grade of OPC
what is correct temperature for pouring concrete?
how many time use of plywood shuttering and IS code
how you confirm the hard stratum for driven cat in situ pile work?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
1.How much strength will be attained for M30 grade of concrete after 28 days? 2.Is it attain 30 N/mm2 or target mean strength?
what is the different betweem expansion and construction joints
how to clculate the %of concrete strenght achive after curing?load
0 Answers L&T, RJ Construction,
WHAT IS YOUR EXPECTED SALARY?
0 Answers ADITI, Allfon, Amazon, Ralph Lauren, Starbucks,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)