Which BOM item category you have used?
No Answer is Posted For this Question
Be the First to Post Answer
What is finite scheduling?
Can’t one material be assigned to more than one operation in a routine?
what are the problems you faced in MRP?
What is collective order. Pre requisite of the collective order?
Define gaps.
What is standard order type
How do you integrate HR (employee) with PP?
Do you use group BOMs for engineering/design and copy or assign them to plants at implementation?
What are the different type of BOM usage?
What is a ‘routing’ in pp?
What is mrp area and mrp group. tell me differences
What are the t-codes for creating, changing and summarizing bom?