What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answers were Sorted based on User's Feedback
Answer / javeed
Rs. 200.00 per Sqm (clients shuttering and)250.00 (with out client shuttering)
| Is This Answer Correct ? | 7 Yes | 16 No |
Answer / yaseen shah
in pakistan current rate is 32 per square feet of centering and shuttering but without materials!
| Is This Answer Correct ? | 3 Yes | 13 No |
For m25 1:1:2 How to get the quantities of cement,sand,agg for 1cu.mt. thnks in advnce
1. How do you handle non-productive team members?
In a day One Mason can fix How many sqm of 60x60 tiles?
how to calculate the density for high density concrete ? or is it same as the density of RC?
What are the grade of steel used in the concrete design.?
8 Answers Engineers India Limited,
How many types of stirrups are there? How to calculate their cut lengths?
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
what means if slump is less than 25mm and greater than 80mm?
plz tell me max persantage of sand for every mix design by volume or weight.
what is the 0 value in quantity surveying
How and where from do we get 162 for calculating sectional weight of TMT
How to calculate the lap length rod of column, Beam,Slab please give me a details?
4 Answers Ali Baba Engineering and Construction Company, Asha Realty Developers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)