What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answers were Sorted based on User's Feedback
Answer / javeed
Rs. 200.00 per Sqm (clients shuttering and)250.00 (with out client shuttering)
| Is This Answer Correct ? | 7 Yes | 16 No |
Answer / yaseen shah
in pakistan current rate is 32 per square feet of centering and shuttering but without materials!
| Is This Answer Correct ? | 3 Yes | 13 No |
what is the MSL?where is it located?
2 Answers C-Tech RC Design, Era Infra Engineering, IVRCL,
how much quantity of cement(bags)concrete(20mm)and sand(sqft)is used in 1:3:6 PCC
what is lap length?
how to convert kg/m3 to cu ft
which is higher specific gravity or bulkdensity
what is the least-count of plane- table,dumpy,theodolite,compass,tachometer?
What is the full form of APVC Pipe?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
Please design 12.5m long dubbly beam
0 Answers Aarya Construction Design,
What is horizon or horizontal mining?
9*9m 1:4:8 ratio using what quantity of 40mm aggregate, sand&cement please tell anwser
what are the forces acting on gantry girder
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)