very simple or less time consuming formula for reinforcement calculation by moment
No Answer is Posted For this Question
Be the First to Post Answer
methode of psc girder stressing
Explain what is change order request?
whether earth to the height of 80cm could be filled in the basement inm place of jamuna sand
How many 6.5 * 6.5 tiles would i need for a 36-sqaure-foot room?
how do understand the plinth beam croos section diagram
What is the basic difference between OPC
what type of qustions can i expect from soil mechanics
Which are the Steel tests ?
What do you mean by tolerance factor of concrete ?
What is the IS code for cube testing?
How to calculate no of 12 mm dia bars in a ton
Ehat slump test of column & retaing wall.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)