What will be compressive strength of bricks , Hollow blocks,
Solid blocks
Answers were Sorted based on User's Feedback
Answer / venkatesh
common building bricks-5n/mm2
2 nd class bricks-7n/mm2
1 st class bricks-14n/mm2
Is This Answer Correct ? | 81 Yes | 10 No |
Answer / hardeep singh
7 to 14n/mm2
7 to 14n/mm2 brick called A class
above 14n/mm2 called AA class
Is This Answer Correct ? | 32 Yes | 6 No |
Answer / andy
Depends on the strength specified, blocks range from around
2.8 N/mm2 to 20 N/mm2, bricks tend to be much stronger.
Is This Answer Correct ? | 7 Yes | 2 No |
Answer / sundarapandiyan
bricks class 1=7.5 n/sqmm,
class 2= 4.5 n/sqmm,
class 3=3.0n/sqmm.
solid and hollow blocks, grade A= 3.5-7 n/sqmm.
grade B= 2-5 n/sqmm,
grade C=1.5 n/sqmm,
grade D=4-5 n/sqmm.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / sunny
the compressive strength of blocks varies from about 2-
15kN/mm2. But this value depends on the target compressive
strength.
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / murali krishna r
Minimum designation of Class 1 designation Brick of std.
size shall not be less than 35kg/cm2 or 3.5 N/mm2 where as
solid block is 40kg/cm2
Is This Answer Correct ? | 3 Yes | 2 No |
why don't we need shear reinforcement in slabs?
C40/50 of concrete strength is saying that 40Mpa(by using cylinder specimen) and 50Map (by using cubic specimen), but this concrete strength is Characteristic concrete strength or target mean concrete strength?
Difference between the setting time and hardenin time of concrete
what is injection grouting and what is rewiring.
What is mix design
what is the formula for lapping length
how to check and keep control on the wastage of material at site
0 Answers Aashray Design Consultants, ABC Infra, Jain Group,
Mix proportions of m30,m35,m40
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
in construction feild make the column rods are uneven ( e.g 1 column we have 6 nos of bars that 6 nos of bars are varrious level- 1 bar 10';2 bars 9';3 bars 8') what is resion to put different level if difference are required or not?
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
anyone can tell me the consumption of steel and concrete per sqft.?