What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answer Posted / surajitg
Labour cost is around Rs. 550.00 per cum of concrete and shuttering (clients shuttering) labour cost is Rs. 220.00 per Sqm.
| Is This Answer Correct ? | 31 Yes | 21 No |
Post New Answer View All Answers
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
what is concrete canvas?
What do you mean by the word 'shear'?
What is the strength of cement?
Define different types of roof systems?
how many material required for brickbat water proofing of toilets.
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
What is the difference between a wood shake and wood shingles?
150mm bricks size how many use 4.14 m3
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
What are the applications of cad?
what is high type road and low type roads
how much area can be platered by a mason for exterior
how i convert mm into standard wire guage (SWG)no.
what will happen if one could not properly follow the spacing of slab reinforcement bar?