What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answer Posted / surajitg
Labour cost is around Rs. 550.00 per cum of concrete and shuttering (clients shuttering) labour cost is Rs. 220.00 per Sqm.
Is This Answer Correct ? | 31 Yes | 21 No |
Post New Answer View All Answers
Pls explain me about tension and compression in a flat slab
where i can get material costs on weekly basis
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
Define line type?
How many kilo-newtons equals 1000 kilogram?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
What things architect have to take care of before starting any project?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
What are wooden shingles?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
material used for mendrel use to bend epoxy coated rebar
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
how to tie 10 legged stirrups
How many feet are in 4 square yards?