What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answer Posted / javeed
Rs. 200.00 per Sqm (clients shuttering and)250.00 (with out client shuttering)
| Is This Answer Correct ? | 7 Yes | 16 No |
Post New Answer View All Answers
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
how to convert sand in Cft to Kgs
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
IS code for Rolling Margin of steel
Spider cracks occur in beam bottom due to––
What is missing report and how to prepare
How to calculate plastering for elevated water storage tank