Please provide detail I.S standard code for using crush
sand instead of river sand for plaster and concrete grade
M15, M20, M25 and M30 and its mix design
No Answer is Posted For this Question
Be the First to Post Answer
bulkege of concrete for design mix concrete for grade m30
How do you measure concrete?
what is the development length?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
How much steel required for 1000 sq ft slab 4" thickness.
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
how to carry out rate analysis for RCC work in column using M20 ?
1 Answers Mazna Building Contracting,
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
what does 1 in 30 or 1 in 40 mean when constructing camber in roads.
what is specific gravity of soil?
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)