What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answer Posted / yaseen shah
in pakistan current rate is 32 per square feet of centering and shuttering but without materials!
| Is This Answer Correct ? | 3 Yes | 13 No |
Post New Answer View All Answers
The 4 main factors to start a construction project are––
What will you do if you encounter problems like accidents?
what is w/c ratio in dry lean concrete for m10 mix design
which method is used in semi-rigid connection design??
Why are pull-out tests performed for soil nails?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
what is the productivity in aluminium shuttering per day
What is the coeffiencent Friction Angle between Steel and Ashphalt?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
Permissible wastage of cement as per IS code ? In which IS code I get it?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Minimum and maximum size of the building components