Is your generator is automated or manual if so do you know the circuits?..

Answer / yuvi

Honestly, this question does not make any sense. However, I
will try to answer to the best of my understanding.

1) I don’t have a generator.
2) Difference between manual and automated generator is
that in a manual start generator, we will have to manually
start it. In an automatic start generator, a circuit senses
that the power has failed and starts the generator
automatically using a small battery powered motor similar
to the ones that start your car. The sensing circuit can be
of a wide variety. It can be a magnetic relay or an
electronic circuit depending on the area of application.

Is This Answer Correct ?    13 Yes 1 No

Is your generator is automated or manual if so do you know the circuits?..

Answer / tapas

in both Auto and Manual cases circuit diagram can be found in the Drawing of Sync panel/AMF panel. Its a selector switch by which user can select either Auto mode or Manual mode.
DG start and stop circuit has two ways to operate which can be found on drawing.
1.Manual Mode: In this mode push button start and push button stop operates DG. i.e. when power fails DG can't be started Automatically. Operator should start the DG manually.

2. Automode: PLC senses absence of Power and commands DG to start.

Is This Answer Correct ?    10 Yes 0 No

Is your generator is automated or manual if so do you know the circuits?..

Answer / ferozuddin

generator wiil be function as a manual and also auto .
manual in case of when there will be no interface with the
auto transfer switch (ATS).when generator is interface with
the ATS it will work auto in case of emergency

Is This Answer Correct ?    4 Yes 1 No




Is your generator is automated or manual if so do you know the circuits?..

Answer / mani0786

mannully start genset start manually & wwhen it come with a amf or ats panel it said auto genset well sir your question is out my mind but so i give it a simple sot

Is This Answer Correct ?    1 Yes 0 No

Is your generator is automated or manual if so do you know the circuits?..

Answer / shyamuchary

we have 3 types
1.manual
2..auto.3.semi manual

Is This Answer Correct ?    0 Yes 0 No

Is your generator is automated or manual if so do you know the circuits?..

Answer / singadurai58

Its very simple
Take an 230v auxillary contactor with 1NO POINT and 1NC POINT
One single phase connect at one side NO POINT and other end connect to contactor A1(NO VOLT COIL).A2NEUTRAL directly connected.
Positive (+) supply24 v connected at NC POINT one side and other end connected at generator starting switch .
When EB powersupply is there the contactor is on.
When EB supply cut through NC POINT the positive supply passing to the switch so the generator is on.
Its very cheap.

Is This Answer Correct ?    0 Yes 0 No

Is your generator is automated or manual if so do you know the circuits?..

Answer / ponvel

manual

Is This Answer Correct ?    2 Yes 5 No

Post New Answer



More Electrical Engineering Interview Questions

why transformers are put with supply for 24 hours before giving supplying to a locality?

2 Answers  


how to find ratio of CT & PT in 66/11kv 12 mva supply system ? explain with calculation.

0 Answers   Adani, Mahaveer,


What is icu and ics in Acb and how many time icu or ics passes from breaker?

0 Answers   Engineering Vision,


need help, please can someone tell me how can i calculate the main breaker and branches breakers to distribution panels (MDB) depending on the load ampere .. i really need it but can't find any site >>

3 Answers  


i want to do a project on PLC.... please give me an idea.....

1 Answers  






how to calculate KA rating of C.B?explain with Formula.

1 Answers  


why impudance relay used for medium transmission power system? why not others?

0 Answers  


As the one point of eac phase winding is connected to each other in satr connction. Even if that at distribution side collesion of two diff phases result in to blast. Why?

1 Answers  


High speed earth switch operation with diagram

0 Answers   KSEB, Siemens, L&T, Sanden Vikas,


How can we calculate the rating of capacitor bank to be connected for a particular load(ex.100kw)to improve the power factor from 0.8 to 0.9?

4 Answers   Voltas,


How many types of Transformers are there?

8 Answers  


from where the self excitrd induction generator get the power?why is the voltage regulation is poor of seig?

0 Answers  






Categories
  • Civil Engineering Interview Questions Civil Engineering (4639)
  • Mechanical Engineering Interview Questions Mechanical Engineering (3703)
  • Electrical Engineering Interview Questions Electrical Engineering (15780)
  • Electronics Communications Interview Questions Electronics Communications (2638)
  • Chemical Engineering Interview Questions Chemical Engineering (762)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (79)
  • Bio Engineering Interview Questions Bio Engineering (30)
  • Metallurgy Interview Questions Metallurgy (95)
  • Industrial Engineering Interview Questions Industrial Engineering (199)
  • Instrumentation Interview Questions Instrumentation (2882)
  • Automobile Engineering Interview Questions Automobile Engineering (171)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (41)
  • Marine Engineering Interview Questions Marine Engineering (62)
  • Power Plant Engineering Interview Questions Power Plant Engineering (170)
  • Engineering AllOther Interview Questions Engineering AllOther (1334)