Is your generator is automated or manual if so do you know the circuits?..

Answer / yuvi

Honestly, this question does not make any sense. However, I
will try to answer to the best of my understanding.

1) I don’t have a generator.
2) Difference between manual and automated generator is
that in a manual start generator, we will have to manually
start it. In an automatic start generator, a circuit senses
that the power has failed and starts the generator
automatically using a small battery powered motor similar
to the ones that start your car. The sensing circuit can be
of a wide variety. It can be a magnetic relay or an
electronic circuit depending on the area of application.

Is This Answer Correct ?    13 Yes 1 No

Is your generator is automated or manual if so do you know the circuits?..

Answer / tapas

in both Auto and Manual cases circuit diagram can be found in the Drawing of Sync panel/AMF panel. Its a selector switch by which user can select either Auto mode or Manual mode.
DG start and stop circuit has two ways to operate which can be found on drawing.
1.Manual Mode: In this mode push button start and push button stop operates DG. i.e. when power fails DG can't be started Automatically. Operator should start the DG manually.

2. Automode: PLC senses absence of Power and commands DG to start.

Is This Answer Correct ?    11 Yes 0 No

Is your generator is automated or manual if so do you know the circuits?..

Answer / ferozuddin

generator wiil be function as a manual and also auto .
manual in case of when there will be no interface with the
auto transfer switch (ATS).when generator is interface with
the ATS it will work auto in case of emergency

Is This Answer Correct ?    4 Yes 1 No




Is your generator is automated or manual if so do you know the circuits?..

Answer / mani0786

mannully start genset start manually & wwhen it come with a amf or ats panel it said auto genset well sir your question is out my mind but so i give it a simple sot

Is This Answer Correct ?    1 Yes 0 No

Is your generator is automated or manual if so do you know the circuits?..

Answer / shyamuchary

we have 3 types
1.manual
2..auto.3.semi manual

Is This Answer Correct ?    0 Yes 0 No

Is your generator is automated or manual if so do you know the circuits?..

Answer / singadurai58

Its very simple
Take an 230v auxillary contactor with 1NO POINT and 1NC POINT
One single phase connect at one side NO POINT and other end connect to contactor A1(NO VOLT COIL).A2NEUTRAL directly connected.
Positive (+) supply24 v connected at NC POINT one side and other end connected at generator starting switch .
When EB powersupply is there the contactor is on.
When EB supply cut through NC POINT the positive supply passing to the switch so the generator is on.
Its very cheap.

Is This Answer Correct ?    0 Yes 1 No

Is your generator is automated or manual if so do you know the circuits?..

Answer / ponvel

manual

Is This Answer Correct ?    2 Yes 5 No

Post New Answer



More Electrical Engineering Interview Questions

testing of transformer

1 Answers   Vijai Electricals,


how can check the resistance of battery contact?

0 Answers   Cipla,


why the indian frequency is 50 hz & U.S.Frequency of 60 hz

3 Answers  


Is it recommended to apply H.pot test for new cables segments after terminations or joints, however, this cable has been tested before at the manufactor by the vendor ? or only we can apply megger tests ?

1 Answers   Centroid,


To have variable speeds we use a. Induction motor b. Traction motor c. Shunt motor

1 Answers  






please explain power factor in simple words.....

3 Answers  


The company is wiling to buy you 5 pcs of equipments in your electrical tool kit. Plz tell what are the 5 things you want?

3 Answers  


how to size H.T & L.T Panel ?

0 Answers   Schneider,


lead acid battery electrolity?

2 Answers  


WHAT HAPPENS IN DIFFERENTIAL PROTECTION IF CT REACHES ITS KNEE VOLTAGE POINT?

4 Answers   Jindal,


Why we are using Isolation Power Transformer inplace of commercial power transformer? What's the difference between them?

0 Answers   UPCL,


Dear All, If we have 8No. 11kV cables running underground that are required to supply 20MW to a new development. What is the sustained current in Amps? Please advise.

1 Answers  






Categories
  • Civil Engineering Interview Questions Civil Engineering (4646)
  • Mechanical Engineering Interview Questions Mechanical Engineering (3704)
  • Electrical Engineering Interview Questions Electrical Engineering (15794)
  • Electronics Communications Interview Questions Electronics Communications (2638)
  • Chemical Engineering Interview Questions Chemical Engineering (763)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (79)
  • Bio Engineering Interview Questions Bio Engineering (30)
  • Metallurgy Interview Questions Metallurgy (95)
  • Industrial Engineering Interview Questions Industrial Engineering (199)
  • Instrumentation Interview Questions Instrumentation (2884)
  • Automobile Engineering Interview Questions Automobile Engineering (171)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (41)
  • Marine Engineering Interview Questions Marine Engineering (62)
  • Power Plant Engineering Interview Questions Power Plant Engineering (170)
  • Engineering AllOther Interview Questions Engineering AllOther (1336)