Do you have done System copy? What are the steps?
No Answer is Posted For this Question
Be the First to Post Answer
How to transfer request which is created directly on quality server & has to be moved to in production server?
If Background job active long time ?
WHICH IS BEST WEBSITE FOR DOWMLOAD ARTICLE ABOUT BASIS
Two background jobs triggered while transporting
before doing client copy you have to adjust table space at os level.what is the single command for that?(with out going through all the menu of brtools)
can we prepare a landscape with ides systems?
sappfprm is a command to see the profile parameter at os level, bt how to change the profile parameters at os level on unix
how to export and import client between two systems?
how can we transport one or two tables in client copy from one client to another client?
Which report will give you list of parameters available in sap
EWA configuration?
1 Answers HCL, Wipro, Yash Technologies,
What is the start up Sequence of Dual stack(ABAP+ JAVA) SAP system??