Hi friends I am Ramesh. I have a doubt. From Which stage we
gathered data(as is study) from client. In project preparation
stage or from Business blue print stage
Answers were Sorted based on User's Feedback
Answer / koti
From BBP Phase, We will gather requirements from client in this phase, We dont involve in Preparation Phese.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / manoj kumar guin
In Business blue print stage we collect data and accordingly
to be document will be prepared .
Thanks
Manoj(7846824740)
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / prasad p
ASAP Methodology(Five steps)
1.ASIS study- collection of Raw data from the client through
mails, phone calls or direct visit to he client place.
2.Blue Print- Refining the raw data and preparing a
procedure for the project.
3.Realization or Implementation
4.Go live and quality control.
5.Support agreement.
Is This Answer Correct ? | 0 Yes | 0 No |
What happens if we check 'exclusive' indication in access sequence, and what happens if we do not check?
what is the difference between tor and availability check? which one system perform first?
Item category determination for the free goods.
What is Sale order processing? Once sale order is created, the processing of S.O means, checking for the materiaal availability using Availability check,shiiping point determination, price determintaion, Back Order processsing, credit check holds removal, but will avaailability check include planned receipts, if planned receipts like prodn order will be considered in Avilability check which is done as Sale order processing, then does it mean that MRP needs to be run for availability check, coz MRP run gives u the qty to be produced and when it needs to be produced. Please clarify.
what is line item
Explain how fi modules and sd modules are integrated?
what is differnce between inclusive and exclusive?
IN SD Credit Management is Active, I want to deactive Credit Functionality but want still to keep it Active at Sales Order Header level, how can we do it
I have created value contract with order type WK1 in VA41. The target value is 500 USD and the net price is 1000 USD. There was no pop up message or error thrown while saving the contract when the net price exceeded the target value. And the system allowed to save the contract. Is there any configuration available to activate the warning or error message or any enhancement need to be done?
if the client logon screen deleted, requirement is urgent? then what can we do ?
how to release only one line item from a sales order which is blocked by credit check
wt is the diff beetween business sale cycle nd customer sale cycle