By any way can we increase the B check hours from 300 to 500
No Answer is Posted For this Question
Be the First to Post Answer
whats plant?
What is the over speed in turbine? What is critical speed?
How do you consider that you can improve and what assistance do you need to achieve this
Why reheater is not used after IP turbine.
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
a gas turbine have how many thermocouples?
LAPT working in alternator / generator
what's interlock relay ?
3 Answers International Mega Food Park Limited, National Power Training Institute NPTI,
How to decide Heating surface area of boiler on their steam generating capacity?
Why we need to maintain furnace and secondary air dp.if it increase or decrease what happens.
what is voltage transformer explain in details
5 Answers Khulna Power, NCC, Reliance Power,
why not maintain Ph 7.0 in Boiler because 7 Ph is not acidic and not basic.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)