Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant...
PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
No Answer is Posted For this Question
Be the First to Post Answer
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
what is the perfect location for furnace draft transmitter in AFBC boiler?
What is the over speed in turbine? What is critical speed?
why HT motor star not grounded?
what is the condition of transformer parallel operation ?
what is CT saturate?and which effect on CT after its saturate?
what is the defenation of efficiency in the high pressor boiler? what is the formila of efficiency in the high pressor boiler?
explain how the third harmonic content of the magnetising current affects transformer design
what is block out in thermal power plant?
how many safeties should be present in boiler?what are they?
4 Answers DN, Nandi, Pump Technology, Siris, Thermax,
transformer shut down process.
voltage and frequency is equal but synchronisation not complete why?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)