Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant...
PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
No Answer is Posted For this Question
Be the First to Post Answer
What is definition of hydrogen cell?and were are you use?
Why cold water is used for Boiler Hydro test
what is need of primary water system in power plant?
what are the major duties of a instrumentation engineer in a power plant.?
Where is the pressure reduce valve in the power plant
How to decide Heating surface area of boiler on their steam generating capacity?
By seeing a Power house Can we justify the kV of that power house?
what is the condition of transformer parallel operation ?
In turbine. why they not use 320 oil?
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
What is the use of NULL meter on AVR panel
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)