What is the functional difference between DOME and R.C.C., where purpose of both covering roof?..

Answer / manu

DOME is required at place where we need obstruction free place
like halls etc. In RCC columns creating obstruction.

Is This Answer Correct ?    3 Yes 2 No

What is the functional difference between DOME and R.C.C., where purpose of both covering roof?..

Answer / harmanpreet singh

DOME is mainly used for larger area to be covered specially circular, where we have to occupy all space.
Where as in RCC there is a hinderence produce by colomns
As DOME don't need support of beam.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Construction joint of beam & slab is provided at––

1 Answers   Construction,


the steel diameters(mm) as 6,8,10,12,14,16,18,20,25,28,32...etc these are used in construction work but which mm size can be used for different structural element such as beams,columns,slabs,footing ?

1 Answers   L&T,


How to plan a project

0 Answers   Ahluwalia Contracts, SDS,


what is mean by shear resistance in concrete?

3 Answers   CCCL, Noble Consolidated Glazings, Sobha Developers,


What Should be the CBR Value for Transported (Selected) Soil.whether it can be 5% or not ?

3 Answers   Jindal,






What is meant by Characteristic Strength of concrete/concretemix and how is it related to the 28 day cube strength. Are these defined in either or both B ritish Standards or Eurocodes?

1 Answers   Atkins,


rimmer in pile foundation

0 Answers  


what is difference between curtain walling and glazing and spider system which are using in building external finish systems.

2 Answers  


what is the advantage of electronic theodolite over transit theodolite?

3 Answers  


How do you calculate load bearing capacity of a waffle slab?

0 Answers  


How to compute minimum number of columns required for a site from area of site?

0 Answers  


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)