I have certain queries, please help to solve. a) length of
pile bore is 4m.excavation quantity will be area * length
where area will be pi/4 * dia*dia. Is this right? b) It is
a single reamed pile of 300m dia and reamed dia is 750mm.
can any body help me to calculate excavated quantity of
this bulb(reamed section),, concrete quantity in bulb with
showing the formulas to be used?
No Answer is Posted For this Question
Be the First to Post Answer
What are the steps involved in the concreting process?
How to calculate brick work quantity?? Block work quantity??
Describe the term BILL OF QUANTITY (BOQ)?
1.why can't we used sea sand in construction? 2.can we change sea sand into normal sand? if yes how?
how much cement is contained in 1:5 ratio 4" brickwork for 1 sqft
which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)
what are the ffactors you considered choosing the course?
what is anchor bar??
what is mean by bond strength?
why loss of strength in concrete in 7 days cube test i am not geting mim 7 days strength that is 67 percent for M-35 and my mix design is perfect there is no doughty,and my results are near to 7days percentage but not 67 percent.
4 Answers UPPSC Uttar Pradesh Public Service Commission,
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
What is the difference between yeild strength and compressive strength of steel???
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)