I have certain queries, please help to solve. a) length of
pile bore is 4m.excavation quantity will be area * length
where area will be pi/4 * dia*dia. Is this right? b) It is
a single reamed pile of 300m dia and reamed dia is 750mm.
can any body help me to calculate excavated quantity of
this bulb(reamed section),, concrete quantity in bulb with
showing the formulas to be used?
No Answer is Posted For this Question
Be the First to Post Answer
How we decide the depth and size of footing? Give a example?
what is the name of shuttering oil used in oman
How we can calculate cement and sand for a wall 25ft x 28ft.Thickness of wall is 9inches.
infosys campus ques... u drive a car,nmb of d car is KA17M8719. it leaves at10:26am frm davanager to bangalor which is264km away at a speed of 95km/hrCar reachs bangalor at 4:18pm. nw tel me wat is d date of birth of drvr
9 Answers Ernst Young, Infosys,
how to caluclate sienerge qty in construction in ap
What"s mean by term of BOQ in construction?
13 Answers Jaypee, Shaarc Projects, Xerox,
how many jack required in1sqm area
what is the voice of ratio ?
What is the functional difference between DOME and R.C.C., where purpose of both covering roof?
how much percent are used 20mm,10mm?
why & what is perchatage we are using fly ash in concrete?
What out turn civil works
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)