I have certain queries, please help to solve. a) length of
pile bore is 4m.excavation quantity will be area * length
where area will be pi/4 * dia*dia. Is this right? b) It is
a single reamed pile of 300m dia and reamed dia is 750mm.
can any body help me to calculate excavated quantity of
this bulb(reamed section),, concrete quantity in bulb with
showing the formulas to be used?
No Answer is Posted For this Question
Be the First to Post Answer
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
what is the proportion of M200 &M300 grade concrete
1 Answers Karrm Infrastructure,
Who designed the city of washington dc?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
0 Answers GVR, Howe Engineering, L&T,
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
standered size of toilet & bath?also stair-case?
What is the difference between chamfer and fillet?
how to calculate steel quantity in plinth beam&footing
to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash
why the brick is red in colour?
How to calculate carrying capacity of the existing water supply trunkmain
Define What glue is least sticky?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)