I have certain queries, please help to solve. a) length of
pile bore is 4m.excavation quantity will be area * length
where area will be pi/4 * dia*dia. Is this right? b) It is
a single reamed pile of 300m dia and reamed dia is 750mm.
can any body help me to calculate excavated quantity of
this bulb(reamed section),, concrete quantity in bulb with
showing the formulas to be used?
No Answer is Posted For this Question
Be the First to Post Answer
how to tie 10 legged stirrups
Coverage of 25mm.thick ratio of 1:4 cement mortar?
how to caliculate required amount of cement and sand required for 1cu.m.
plz tell me the compresive stength of genral con. & foam con. all grade after 7,14,21,28 day
What are advancements in civil engineering?
CALCULATE QUANTITY OF RCC COLUMN
How did the romans get water up hills using aqua ducts?
pl.may i place dry mix in casting of drain bed partialy filled with water?if no pl explain.
how to calculate 162/D2 FOR TMT
What are types of mixs ?
How foundation is designed, Column design and beam design
What is 1/8 on the architect ruler denotes?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)