what is the difference between onw way slab & two way slab?
Answers were Sorted based on User's Feedback
Answer / m.saranya
when Ly/Lx ratio is less than 2 then it is two way slab.
and if it is greater than 2 then it is one way slab.
Is This Answer Correct ? | 53 Yes | 10 No |
Answer / ns.udhayakumar
The ratio between longer span to shorter span lessthan 2 two
way slab, more than 2 one way slab. the main reinforcement i
mean tension reinforcement one way slab only shorter
direction , twoway slab both direction provided main
reinforcement.load trnsmission oneway slab two direction
only i mean longer direction only, two way slab 4 direction
load transmit.
Is This Answer Correct ? | 30 Yes | 4 No |
Answer / paresh
alternet bentup steel comes in both ways x-direction as
well as y-direction....
Is This Answer Correct ? | 22 Yes | 13 No |
when Ly/Lx ratio is less than 2 then it is one way slab.
and if it is greater than 2 then it is two way slab.
it is valid only if all the four sides are supported. if the sides are not supported then it'll be one way slab independent of Ly/Lx ratio.
Is This Answer Correct ? | 28 Yes | 41 No |
how to calculate the loads on slab? what are the steps?
how many cubic feet in one unit of sand?
16 Answers L&T, PSPCL, Ratna Infrastructure Projects,
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
Can anybody please tell the procedure to calculate the quantity of admixture in Self Compacted COncrete??
how to calculate the bricks in 100yard
what is means of M50,M20,M15 like this please tell me ?
Soil bearing capacity formula
what is levelling staff least count
how much thick Pcc required for floor tiles
what is main diffrence between vitrified and cremic tile????
2 Answers Colliers International,
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?