What is the functional difference between DOME and R.C.C.,
where purpose of both covering roof?

Answer Posted / manu

DOME is required at place where we need obstruction free place
like halls etc. In RCC columns creating obstruction.

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

it is a corrected question." make a list of engineering property(properties) of soil.

1596


I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

1922


I need model question papers for writing the Dubai municipality exam,for G+1

9401


How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

3705


What does civil status mean?

681






5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?

8491


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1564


what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/

1815


 Describe a time when you anticipated potential problems and developed Preventive measures

2809


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

1937


20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

1895


how meny typs of renging rod?

1796


Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?

1298


How to do base isolation for RC framed structure using ETABS software?

3744


What is the release of lien?

696