How to do lineout of building
Answers were Sorted based on User's Feedback
Answer / swagatam maharjan
by using total station with reference to known coordinates (x,
y & z) of traverse point established on the basis of GPS and
coordinates points of building
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / rupesh
by using thedolite we take horizontal distance,angle.
| Is This Answer Correct ? | 1 Yes | 0 No |
in m25 concrete what is m.
why no deduction for steel is made in the volume of concrete?
how much water you will add to the mix, for making 1 m3 of concrete to achieve strength of mix 20N/mm2 at 28 days.
In barbending schedule why is o.42*D is taken. Means why o.42 only???
different types of rcc slab
Why alternate bars are given bent-up in slab and how to decide the length of bent up?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
How to calculate the quantity of water in cement mortar eg. CM 1:3?
concrete mix design for M 30 Grade
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
what is the basic fundamental of contouring?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)