How to do lineout of building
Answers were Sorted based on User's Feedback
Answer / swagatam maharjan
by using total station with reference to known coordinates (x,
y & z) of traverse point established on the basis of GPS and
coordinates points of building
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / rupesh
by using thedolite we take horizontal distance,angle.
| Is This Answer Correct ? | 1 Yes | 0 No |
What is the neutral axis depth factor formula
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
How gate result to cube for 7 day? Formula for the cube testing?
1 Answers Ambuja, Indiabulls, Legacy,
clear cover for concrete structures as per BS
what is kribs is supporting?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
Construction joint of beam & slab is provided at––
why steel is used in rcc columns? what is its purpose?
What is Time period of a building and its relation with frequency ?
WHAT IS DUCTILITY?
DESIGN PROCEDURE OF THE COLUMNS
What is Lap Length??????
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)