How to do lineout of building

Answer Posted / swagatam maharjan

by using total station with reference to known coordinates (x,
y & z) of traverse point established on the basis of GPS and
coordinates points of building

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

please send me bhel questions on rupesh.017@rediffmail.com

2797


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2314


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

2365


What is the per cu. mt. price of ready mix in Gujarat region.?

2429


I need to constructive work in amaraj batteries

1939


Which is the latest version of solidsworks?

1343


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

2235


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2233


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2241


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3236


what is the 0 value in quantity surveying

2479


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2544


what is the difference between replacement of cement by groundnut shell ash

3306


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1842


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now