How to do lineout of building

Answer Posted / swagatam maharjan

by using total station with reference to known coordinates (x,
y & z) of traverse point established on the basis of GPS and
coordinates points of building

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants

1769


Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.

1422


What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.

1554


If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

1294


What is reinforced concrete?

687






how do you stabilize a waterlogged area in road construction

6303


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1260


how to conversation of all construction material in to brass

4695


In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

2854


How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?

1466


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

2391


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

1003


what is the breaking strength of wall tiles

1944


What is the per cu. mt. price of ready mix in Gujarat region.?

1783


How much material will consume for following specification water tank (9*7.5*6 feet)?