Construction joint of beam & slab is provided at––
Answer / nilesh kulkarni
L/3 zone of span length of beam or slab
| Is This Answer Correct ? | 10 Yes | 1 No |
Which are the top apps for you civil engineer?
what is stress?
which one is strong? field weld or shop weld?
what is the difference between prime coat and tack coat in road construction
what is ppc????
How much cement and water required for cement selery????
How to calculate chejja reinforcement
What is the bar bending schedule
How much cement & coarse sand is used in 1 Sqm plaster for ratio 1:4 of thickness 20 mm ?
Which word is coolest among the 26 alphabets?
how to calculate the concrete mix m30 by volume
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)