how beam.coloum ,slab, footing are designed as per indian
code.. detail procedure?
No Answer is Posted For this Question
Be the First to Post Answer
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Explain the latest method to detect a crack in a building?
what is cement mortar cube size and strength in 3days, 7days and 28days
What is relation between weight and grade of concrete?
1 what is the nature of your job? 2 what major product or service does your company offer? 3 hoiw does the knoledge of chemistry hels in your job?
What is the 162 in steel weight formula?
when will the position neutral axis shifted in beams
Where are laterally loaded piles are used in practice?
neutral axis more than the critical neutral axis then rainforcement in rcc beam belong to over or under rainforcement
beam is fixed at both end which is 8 m span carry udl of 10 kn/m at left half span.there is internal hinge at center.what is reaction at center
1M2=how much M3?
what is the use of bottom reinforcement in Cantilever Beam?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)