why cracks are being developed in a structure? any specific
reason? is there any remedial solution?
Answers were Sorted based on User's Feedback
Answer / mrdraj100
there is not any specific reasons for cracks: there are
variety of cracks that can occur in any structure (shear
cracks, flexural cracks)etc.....for these different cracks
there is different mechanism involved..for remedial solution
the reason behind the crack has to be found....
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / ademola
There are series of crack in the structure of a building, but mostly it come the from the foundation due to settlement or improper mixing ratio of concrete, or if concrete contain too much impurities.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nagarajan.v
Improper mixing proportions and curing its a main reason for cracks because the voids are formed in this structures. So the crack is easily to formed
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sagar bothare
CONTINOUS WATER SHOULD BE GIVIN TO RCC STRUCTURE. DURATION
ATLIST 7 DAYS
| Is This Answer Correct ? | 0 Yes | 1 No |
In Rcc structure ,mainly cracks devloped .This is due to not
proper cover maintained.
Cover block should be fixed in between reinforcement and bar.
| Is This Answer Correct ? | 0 Yes | 2 No |
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
what is the weight of concrete for 1 cum?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
0 Answers Ajai Builders, Malhotra Associates,
WBM Road aggregates quantity calculation
Define what is quality...
What is the mix ratio by volume of concrete grade 45
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
how to calculate the number of cement bags required for 1m3 of work
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)