how to calculate no of rings & weight of column including rings?

Answers were Sorted based on User's Feedback



how to calculate no of rings & weight of column including rings?..

Answer / tariq afridi

for example a square coloumn
no of bars are #22
dia of bars $6 no / 6 sooter bars
lenght of each bar is 10 ft.
solution.
weight of 5 no bar per/ft is 1.043lbs
firstly find rft 22*10 = 220rft 220* 1.043= 229.46 lbs
number of rings
height/centre to centre distance.
10'/.5' = no of rings are 20.

Is This Answer Correct ?    1 Yes 0 No

how to calculate no of rings & weight of column including rings?..

Answer / sumanth maharana

Length of the Beam and column. min "5"inc Depend height.Yes weight of column including rings

Is This Answer Correct ?    4 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

how much L is provide in footings. what is min and max length of L. what is the formula

1 Answers  


Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.

0 Answers   NTPC,


what is the meaning of TMT Bar and what is benifit of these Bars?

6 Answers   L&T,


If i buy some material and the seller asks me my TIN number what does that mean?? Is it my Taxpayers Identification number or it is my Tax invoice number? What does both of these stands for???

2 Answers   Simplex,


cavitations is caused by

2 Answers  






What is tension & compression member in reinforcement?

2 Answers  


HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?

0 Answers   URC Construction,


if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix

0 Answers   Ras Engineering, UltraTech,


We are working building soling work so soling thickness given 230mm but total are 50 cum. So I am purchased how meny tons is here spreading plz. Tell me

1 Answers   GKC Projects Limited GKCPL,


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

0 Answers  


Which brick is best for construction ,either fly ash or AAC BLOCKS

0 Answers  


Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)