why cracks are being developed in a structure? any specific
reason? is there any remedial solution?
Answer Posted / nagarajan.v
Improper mixing proportions and curing its a main reason for cracks because the voids are formed in this structures. So the crack is easily to formed
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the difference between linear dimension and aligned dimension?
all technical question
RR masonry rate analysis
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
How to calculate material and labor required for 100 m2 plaster?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
what is tension column?
how many material required for brickbat water proofing of toilets.
States some of the tool bars used in cad?
What is demising walls?
in 100 cft = 1350 bricks in 100 cft = ? bloks
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you