why cracks are being developed in a structure? any specific
reason? is there any remedial solution?
Answer Posted / sagar bothare
CONTINOUS WATER SHOULD BE GIVIN TO RCC STRUCTURE. DURATION
ATLIST 7 DAYS
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
During reclamation how can the occurrence of mud waves can be rectified?
what is relation between SPT N value and driving piles after conducting a soil test?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
What are the phases inspections are done by local authority while construction?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
in 100 cft = 1350 bricks in 100 cft = ? bloks
how to convert cement, sand aggregate quantity from M3 to kg with full description?
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
What is the standard volume of pharma in cub ft
What are the different methods for drawing an arc?
How to calculate the crank rod in slab